Source URL: https://www.theregister.com/2025/03/29/nvidia_moores_law/
Source: Hacker News
Title: Nvidia GPU roadmap confirms it: Moore’s Law is dead and buried
Feedly Summary: Comments
AI Summary and Description: Yes
Summary: The text discusses Nvidia’s advancements in GPU technology at the Nvidia GTC event, detailing its challenges with scaling compute and power requirements for datacenters, particularly related to upcoming ultra-dense GPU systems. It highlights the limitations imposed by Moore’s Law, the shift towards greater silicon densities, and how these developments affect infrastructure and thermal management in datacenters.
Detailed Description:
The narrative centers on Nvidia’s unveiling of its future acceleration technologies and the associated challenges in the context of scaling computational resources. Here are the key points:
– **Breaking Moore’s Law**: Nvidia’s CEO Jensen Huang expresses that Moore’s Law, which predicts the doubling of transistors on chips approximately every two years, is effectively “dead.” This indicates a significant shift in the semiconductor industry and the implications for computational scaling.
– **Innovations in GPU Architecture**:
– Nvidia introduced the Blackwell Ultra processors and outlined its next generations, including the projection of a 600kW system featuring 576 GPUs.
– A future GPU family is set to be named after Richard Feynman, marking a celebratory nod in the tech community.
– **Challenges in Scaling Compute**:
– The text outlines the difficulties in advancing process technology for improved performance, with Nvidia resorting to increasing the silicon count per compute node.
– Current high-density systems using Nvidia’s NVLink technology are pushing the upper limits in terms of power requirements and thermal management, with a strategy to scale GPU counts from 72 to 144 and then to 576 per rack.
– **Memory Advancements**:
– The memory configurations are significantly improved, with future models expected to house up to 1TB of memory per package, doubling the existing capacities.
– Innovations like HBM4e memory promise significant bandwidth increases, crucial for handling complex AI workloads.
– **Power and Cooling Solutions**:
– The projected 600kW racks pose substantial challenges for datacenter operators, necessitating advanced cooling technologies and power management systems.
– Nvidia’s partnership with Schneider Electric highlights the need for purpose-built datacenters (“AI factories”) that can manage the increased thermal demands.
– **Infrastructure Concerns**:
– The availability of power to feed these large installations is a critical issue, with concerns about sustainability amid growing energy demands.
– Competitors like AMD and Intel are expected to face similar challenges, shaping the future of datacenter infrastructure.
– **Industry Implications**:
– Nvidia’s information sharing about its roadmap allows infrastructure partners to prepare for future demands. This strategic transparency not only enables collaboration but also prepares the market for competitiveness among other chip manufacturers.
Overall, the text illustrates significant trends in GPU technology advancements, alongside the pressing requirements for infrastructure adaptations, which will be essential for professionals focused on datacenter operations and AI-related technologies.